Multi-Family and Housing Services

At Murphy Company, we have been delivering efficient multi-family construction services since 1907.

By taking the time to get to know you and your business, we are able to create specific solutions that are tailored to your needs. We have the experience and knowledge necessary to perform successful energy audits, HVAC, plumbing, piping and temperature control services for any apartment, condominium, senior housing or university housing construction project. We also are experienced at incorporating mixed-use retail and concierge services that often accompany larger multi-family projects.

Our team of certified professionals continues to set themselves apart from the competition by holding each of our individual employees accountable for removing any of the barriers that prevent us from having a zero incident project. Our customer’s safety is our top priority and something that we take very seriously. That is why we are here to provide them with a multi-family building project that is safe and efficient. If you are beginning a new project and searching for the right partner to assist in keeping your employees safe, it is time to call Murphy Company. Give us a call today to get started on your next project!

Murphy Company Featured Multi-Family/Housing Project

212 South Meramec – Clayton, MO

212 South Meramec is a 26-story 394,566 square foot mixed-use project that started in November 2015 and will be the largest multi-family and mixed use building in Clayton to date.  The Building will include 20 floors, 222,588 sq. ft. of luxury apartments, and five levels of parking.  The first floor will have 12,013 sq. ft. of retail space and the 17,296 sq. ft. rooftop level is scheduled to include a pool deck, lounge, recreation room and fitness center.  The residential floors will include 250 units and one, two, and three bedroom options.

Murphy Company was contracted to install plumbing, HVAC piping and HVAC sheet metal work for the building.

The plumbing system features ProVent for sanitary system and use of PEX piping for most of the domestic water up through 3″ diameter.  The HVAC system features 2-pipe vertical stack heat pumps for individual unit control, dedicated outside air to each unit, and high efficiency boilers.  The project utilized BIM and pre-fabrication for all the systems due to the limited amount of laydown space within the project’s footprint.  BIM allowed us to pre-pipe and skid-mount the majority of our piping in our fab shop.  The prefabricated pipe made our installation more efficient while minimizing our material handling and crane picks.

The Murphy Project Team

  • Project Manager- Joel Maevers
  • Piping Foreman – Scott Kiely
  • Plumbing Foreman – Jason Branch
  • Sheet Metal Foreman – Ken Schilling

Murphy Scope of Project Work

  • HVAC
  • Plumbing
  • Design/Build